fully considers the on-site usage conditions and usage requirements when designing the laboratory gas circuit plan. The pipelines are designed with 316l stainless steel as the basic pipe material. The stainless steel inner wall is smooth and has good corrosion resistance. It can ensure the purity of the gas while reducing the risk of leakage. However, the installation process is relatively complicated. Seamless welding technology is used at the interfaces of all pipes. There should be no residual iron filings falling into the pipes after the incisions are made.
Laboratory air circuitPipeline fixing: Aluminum alloy fixed pipe racks are used for fixing to walls or other buildings. During installation, keep a specific distance from the laboratory's heat and water sources, and then perform a pressure maintenance test on the installed pipelines for more than 24 hours to ensure there is no leakage.