Briefly describe other requirements for laboratory gas circuits
1. Stainless steel pipe fittings can only be unsealed when installed on site. After unsealing, they must be purged with 5N high-purity gas before they can be connected to the system. After the entire system is installed, 5N high-purity nitrogen must be used for large-flow purging to ensure the cleanliness of the entire system.
2. After the installation of the laboratory gas line is completed, relevant strength tests, sealing tests and stability tests shall be carried out as required.
laboratory gas circuit is a relatively complex and rigorous system project, which requires a full-time engineering company to participate in the overall design and planning.
Please indicate the source for reprinting:http://www.mdpsb.com